|
|
Our featured case studies show how we have solved complicated transportation and supply chain challenges for companies operating in the domestic and global marketplace.
| |
|
|
 |
|
GAP Inc.
Averitt Tailors Supply-Chain Solutions for GAP Inc.
Challenge:
Several years ago, Gap Inc. North American Transportation recognized the opportunity to increase efficiency and productivity in deliveries to over 2,700 stores in the United States and Canada. The North American Transportation team analyzed its domestic logistics model and partnered with Averitt to creatively explore more efficient delivery solutions.
Solution:
Averitt recognized this need and put together an optimized delivery model specific to Gap Inc.’s business. As a result, Averitt was selected to provide time-definite delivery service for Gap Inc. stores across four markets.
Results:
By focusing on superior service, Averitt was able to successfully adapt and incorporate the needs of Gap Inc.’s business and helped to provide a more effective and efficient delivery model to Gap Inc.’s network.
Download the case study (2 MB)
|
|
 |
|
Shoe Carnival
Averitt and Shoe Carnival: A Good Fit
Challenge:
Shoe Carnival needed
a provider who was
professional and who
could offer solutions to
improve their supply chain
efficiency.
Solution:
• Supply Chain Optimization:
third party backhauls
• Flexible, Customized
Solutions: non-traditional
equipment
• Professionalism: on-time
deliveries and sharp-dressed
drivers
Results:
• Active third-party backhauls
• Reduced costs
• Optimized delivery routes
• Improved efficiency
• Specialized equipment
• Lower fuel costs
• Professional drivers
• Increased confidence
Download the case study (1 MB)
|
|
 |
|
Contemporary Children's Clothing Manufacturer
Averitt Outfits Contemporary Children's Apparel Brand with
Improved Speed and Efficiency
Challenge:
Increase customer satisfaction by creating an efficient speed-to-market solution for time-sensitive merchandise.
Solution:
By using its import/export facilities, Averitt took an unconventional
approach geared at avoiding peak port hours and modernized
communications among the manufacturer's supply chain partners.
Results:
• Cut days off shipment transit time
• Significantly reduced cycle time
• Cut inventory costs dramatically
Download the case study (1.5 MB)
|
|
 |
|
VF Corporation
Averitt SCM Solution Trims Retailer’s Bottom Line
Challenge:
Streamlining the warehousing and distribution system of Vanity Fair's 14 distribution centers and 30 external suppliers.
Solution:
Averitt now manages the entire process for VF from electronic data exchange to consolidation, cross-dock, and providing direct-to-store delivery.
Results:
Improved visibility for VF's retail stores, better inventory management capabilities, and efficient tracking of inventory throughout the system.
Download the case study (1 MB)
|
|
 |
|
Summer Classics Home Furnishings
Averitt Furnishes End-to-End Importing Solution from Far East to U.S.
Challenges:
• Unpredictable deliveries
• Customs delays
• Improper documentation
• Dockside delays
• Inefficient drayage system
Solution:
Streamline the flow of goods and paperwork with integrated solutions and complete shipment visibility during the entire process.
Results:
• Improved speed to market from 30 days to 23 days, shaving 7 days off the end-to-end import process.
• Streamlined documentation process, eliminating costly detention charges at the ports and improving materials flow.
Download the case study (337K)
|
|
 |
|
Leading Manufacturer of Fiber Optic and Lighting Products
Averitt's Single Source Solutions Deliver Rock Solid Results
Challenge: To manage multiple regional plants and warehouses in a more cost-effective manner. To shorten production times, order-to-delivery times and transit times on international shipments.
Solution:
Single-source transportation solution comprising:
1) Operating interplant dedicated moves and cross-country dedicated truck program
2) Managing exports to Germany and imports from the Far East
3) Handling inbound and outbound LTL and truckload transportation
4) Coordinating time-critical shipments for quick-turn order fulfillment
Results: Streamlined operations, lower costs and faster transit times.
Download the case study (828K) |
|
 |
|
Cracker Barrel Old Country Store
Averitt Cooks Up Dedicated Program to Improve Fleet Efficiency
Challenge: Establish a “visible” company fleet without the operating and maintenance costs.
Solution: Averitt’s Dedicated Fleet Management Services.
Results: More time for Cracker Barrel to focus on serving their customers. Less money spent on moving goods.
Download the case study (226K) |
|
 |
|
Major Food Products Manufacturer
Averitt Sweetens the Role of Transportation Management
Challenge: Lowering costs and streamlining operations.
Solution:
1) Mode Selection/Carrier Management
2) Load Planning/Coordination of Outbound and Inbound Transportation
3) Dedicated Transportation
Results: Significant cost savings and improved margins.
Download the case study (96K) |
| |
|
|
|